top of page

Client

Completion

Location

Size

Team

PAM Malaysia

2013

Kuala Lumpur | Malaysia

350 m

Henry Ngo, Ho Kat Jing, Keith Tan

PARASITIC ARCHITECTURE

KUALA LUMPUR

PLUGGING INTO THE SYSTEM

a

Parasitic Architecture as an adaptable transient and exploitive from of architecture that forces relationships with host buildings in order to complete themselves. It cant sustain their own existence without siphoning energy from the surplus supply demonstrated in host buildings. Through the process of exploration, aiming to localize the subject of parasitic architecture into a single available resource. 

​

The Notion of  basic survival system plug into the host infrastructure [ Factory Chimney ] by tapping into its waste management. That makes the relationship of Parasite Architecture.

PARASITIC ARCHITECTURE | NGO STUDIO

A-BIJIO TABLE

PARASITIC ARCHITECTURE | NGO STUDIO
PARASITIC ARCHITECTURE | NGO STUDIO

Stay Up To Date

To receive our emails on our new projects and our current progress,

please add your email address below

Thanks! Message sent.

1

© 2021 NGO STUDIO

  • NGO STUDIO INSTAGRAM
  • NGO STUDIO FACEBOOK
  • NGO STUDIO PINTEREST
  • NGO STUDIO TWITTER
  • NGO Studio Vimeo
bottom of page